Packaging & pharma

PVC film production: roll-wise stock, gauge and grade control

PVC film makers sell by the roll but buy resin by the bag. Here is how to track compound formulas, roll-wise output, gauge checks and regrind so every kilo of resin is accounted for.

Fibersoft team21 November 20266 min read
Key takeaways
  • Keep a versioned formula (compound) per film grade: resin, plasticiser, stabiliser and additives.
  • Weigh and label every roll with width, gauge, grade, colour and net/gross weight.
  • Record trim, edge waste and regrind per shift, and feed regrind back into stock.

Where PVC film margins leak

A PVC film line turns resin and additives into rolls of clear, coloured, rigid or soft film. Margin leaks quietly: a formula drifts from its standard, gauge runs thicker than ordered, edge trim and start-up waste are never weighed, and regrind sits in bags nobody counts. When stock is only known as 'total kg of film', none of this shows until the year-end stock count.

Formula per grade

Each film grade (for example clear rigid, soft, shrink or coloured) has its own compound formula. Fibersoft ERP keeps the formula as a versioned BOM, issues materials against each production batch, and compares actual consumption with the standard, so a change in plasticiser or stabiliser usage is seen in the same week.

Roll-wise output

  1. Plan the work order with grade, width, gauge and colour from the customer's order.
  2. Weigh each roll as it comes off the line; print a barcode label with roll number, width, gauge, length and net/gross weight.
  3. Record gauge and quality checks against the roll; failed rolls go to a hold or second-grade warehouse.
  4. Dispatch by scanning rolls onto the delivery note, which becomes the roll-wise packing list.

Waste and regrind

ItemHow it is recorded
Edge trimWeighed per shift and booked as regrind
Start-up and change-over wasteRecorded per work order
RegrindReceived back into stock and issued into the next batches
Scrap soldSold from the scrap warehouse at its own price

With formulas, rolls and waste in one system, cost per kg of each grade is based on what the line really used, and pricing decisions can follow the numbers.

Frequently asked questions

Can each PVC roll be tracked separately?

Yes. Every roll gets a number and barcode with width, gauge, grade, length and net/gross weight.

Are compound formulas supported?

Yes. Each film grade has a versioned formula, and actual consumption is compared with the standard.

How is regrind handled?

Edge trim and waste are weighed into a regrind item, which is issued back into later batches.

Fibersoft teamERP consultants and ACCA-qualified finance professionals in Gujranwala, implementing Fibersoft ERP across Pakistan.
See it with your own data

We'll show this workflow in Fibersoft ERP with items and reports from your business.

Book A Demo
Demo pass

See Fibersoft run your process

Book a free Zoom demo for your industry, or ask the AI assistant anything right now.

FROMSpreadsheets & basic software
TOFibersoft ERP
VIAZoom
CLASS1st class ERP
GATEYour industry
MODULES37
BoardingFree demo
Book a demo
↑↓ navigate↵ openCtrlK search anywherePopular